Call us: 1.888.898.5422
facebook
flickr
linkedin
twitter
email
  • Getting Started
  • Introduction
  • Modules
    • Module 1: Group Lodging Services
    • Module 2: Group Lodging Structure
    • Module 3: Working in a Group Lodging Facility
  • Summary
  • Resources

Sample Floor Plan

Below are two examples of floor plans for an ESS GL facility; one with rooms and one without rooms, e.g., gymnasium. Keep in mind that these are only examples and the actual set up will be determined by a number of variables. For this reason, it is beneficial to consider optional set ups if the primary one, for whatever reason, is ineffective.

Module 3

  • Module 3: Working in a Group Lodging Facility
    • ESS Call Out
    • Reporting to Work
    • Group Lodging Set-Up
      • Group Lodging Kit
      • Additional Equipment and Supplies
      • Function/Service Areas
      • Sample Floor Plan
      • Sleeping Area Set Up
    • Guidelines for Working in Group Lodging
    • Demobilizing
    • Activity: Addressing Challenges

Links

  • About Us
  • Acknowledgements
  • Contact Us

Links

  • JIBC Emergency Management Division
  • Emergency Management BC
Creative Commons License

Introduction to Reception Centres by Emergency Management BC (EMBC), in partnership with the Justice Institute of British Columbia (JIBC) is licensed under a Creative Commons Attribution-NonCommercial-ShareAlike 3.0 Unported License. Permissions beyond the scope of this license may be available at https://www.jibc.ca/ess/